This evening I created a template and spot faced the top of the bottom spring plank for one of the Shay trucks. The plank itself was made by welding two 1 1/4″ C-Channels together with a 1/2″ x 3/16″ spacer on the top and bottom. The welding and grinding was a painful experience and confirmed [...]